Causes | Solutions |
The humidity of construction environment is too high or the solvent volatilizes too fast, causing the moisture to condense. | Control the temperature and humidity of the painting environment. |
The paint film is not cured completely. | Strengthen curing such as increasing the baking temperature, extending the baking time and increasing the UV curing energy. |
The coating layer is too thin, showing the base color of the substrate. | Extend the coating time to ensure the thickness of the coating layer. |